In today’s energy-intensive industries, efficient steam generation is more critical than ever. FangKuai’s Euro7 Series Condensing steam boiler, with its integrated combustion–heat‐transfer coupling and advanced flue‐gas cooling modules, directly addresses these pain points, delivering ultra-low emissions, rapid startup, and gas‐cost savings measured in the millions.
Industry Context & Condensate-Return Challenges
Key Steam-Using Sectors
-
Food & Beverage: Breweries, dairies, bakeries, and canneries rely on precise steam for cooking, sterilization, and drying processes.
-
Chemical & Pharmaceutical: From reaction heating and distillation to sterilization, these sectors demand high-purity, stable steam.
-
Textile & Laundry: Fabric dyeing, finishing, and industrial laundering require consistent steam pressure and quality.
-
Power & District Heating: Large-scale plants and campuses use steam for electricity generation, building heating, and absorption cooling.
Condensate-Return Pain Points
-
Temperature Mismatch: Recovered condensate can arrive well above ambient, yet standard boilers tuned for cold feedwater suffer instability or require manual tuning.
-
Efficiency Loss: Without proper flue‐gas cooling and preheating, plants lose both latent and sensible heat, wasting fuel and raising operating costs.
-
System Complexity: Integrating third-party condensate systems often leads to control conflicts, unplanned blowdown events, and unpredictable pressure fluctuations.
FangKuai Euro 7 Condensing Steam Boiler
Coupling Technology
By fusing burner optimization with furnace-side heat‐transfer design, Euro 7 minimizes peak flame temperatures and maximizes transfer area. CFD-driven flame‐shape tuning and electronically controlled air-fuel ratios ensure combustion and heat‐transfer act as one unified system, rather than competing subsystems.
Modular Flue-Gas Cooling (Multi-Stage Condensate Handling)
-
Air-Preheater & Economizer recover sensible heat to boost incoming air above dew point, preventing condensate-induced flame instability.
-
Condensing Module captures latent heat, preheating feedwater from ambient to near-return temperatures without sacrificing boiler stability.
-
Interchangeable Cooling Stages let operators match flue-gas cooling to the exact temperature and proportion of recovered condensate, even when feedwater varies from 20 °C to 90 °C.
Flue-Gas Recirculation (FGR)
A precisely metered portion of cooled flue gas recirculates into the burner intake, lowering flame hotspots to cut NOₓ formation below 30 mg/m³—meeting China’s Class I urban standard—while further stabilizing combustion.
Measurable Gas-Cost Savings
Take a 10 t/h Euro 7 boiler running at 0.5 MPa:
-
Without Condensate Return: Flue gases at 150 °C waste the equivalent of ~112.3 m³/h of natural gas.
-
Annual Cost Impact: Continuous operation translates to CNY 3.53 million in avoidable fuel expenses.
By fully integrating condensate-return handling—recovering both latent and sensible heat—Euro 7 reduces fuel consumption by up to 20–25 %, turning those losses into profit.
PLC Control System
-
Rapid Start-Up: Steam on-demand in as little as 14 minutes minimizes production delays.
-
High Steam Quality: Dryness > 99.9 % ensures safe, water-hammer-free operation in sensitive processes.
-
Smart Control & Cloud Analytics: Real-time metering of gas, feedwater, and steam flows provides true‐efficiency tracking. Data analytics deliver tailored energy-saving recommendations and support continuous control-program optimization.
Get a condensing steam boiler quote
Conclusion
For industries striving to reclaim every joule of heat and eliminate gas wastage, FangKuai’s Euro 7 Series offers a turnkey solution: precision combustion–transfer coupling, adaptable multi-stage condensate modules, and intelligent controls that pay for themselves in fuel savings. Experience millions in annual gas‐cost reductions, paired with ultra-low emissions and rock-solid steam quality—choose Euro 7 for your next boiler upgrade.
Get your best price
Quickly compare 3 FREE quotes
- Engineer quick quote
- The overall delivery speed is fast
- Financial choice
- Low installation costs and cost savings

25 years+ of boiler R&D
More than 20 innovative technologies