Project Schedule
2025/7Project Location
ChinaBoiler Model
SZS-50Fuel Type
gasWe’re excited to partner with China Coal Guoyuan on their new 2×1000 MW ultra‑supercritical units, supplying two 50 t/h startup boilers. From the first design review through factory testing, our team worked side‑by‑side with the plant’s engineers to nail down exact performance goals—quick heat‑up, low emissions and smooth control‑system integration. Every step was planned so the boilers would arrive ready to install and start running right away.
Faster Startup: Our updated heating surface design and pre‑heat system shave about 20% off warm‑up time, so the plant reaches minimum load sooner. Fuel Savings: A refined burner and economizer combo cut auxiliary power draw and uses less fuel on each startup. Smart Control: Built‑in AI routines fine‑tune feedwater and burner settings in real time, keeping temperature and pressure steady during load changes. Solid Build: We use high‑grade alloys and run thorough fatigue tests in our factory to make sure these boilers last. Easy Hookup: Controls and instruments come pre‑configured, so on‑site wiring and commissioning go much faster.
Faster Startup: Our updated heating surface design and pre‑heat system shave about 20% off warm‑up time, so the plant reaches minimum load sooner. Fuel Savings: A refined burner and economizer combo cut auxiliary power draw and uses less fuel on each startup. Smart Control: Built‑in AI routines fine‑tune feedwater and burner settings in real time, keeping temperature and pressure steady during load changes. Solid Build: We use high‑grade alloys and run thorough fatigue tests in our factory to make sure these boilers last. Easy Hookup: Controls and instruments come pre‑configured, so on‑site wiring and commissioning go much faster.